ActsETL Phase 6 Wireframes

Reviewer workflow design previews

Current Phase 6 design

Only the current integrated workbench and the focused provision-investigation wireframe are retained. Superseded wireframes and control inventories have been removed to avoid maintenance overhead while the reviewer design is still evolving.

Preferred wireframe

GOV.UK-disciplined reviewer workbench

Current integrated design reference for the Phase 6 reviewer workbench.

Open preferred wireframe
Use the GOV.UK-disciplined workbench as the main current design reference. The focused provision wireframe remains useful for detailed investigation-layout decisions.

Focused wireframe

Supporting design note

Investigate Provision layout note